C_TS422_2021 Exam Dumps Free Test Engine Verified By SAP Certified Application Associate Certified Experts [Q32-Q49]

Share

C_TS422_2021 Exam Dumps Free Test Engine Verified By SAP Certified Application Associate Certified Experts

Use Real SAP Achieve the C_TS422_2021 Dumps - 100% Exam Passing Guarantee


SAP C-TS422-2021 certification exam is a valuable credential for professionals seeking to advance their careers in the field of production planning and manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification demonstrates a high level of expertise in the SAP S/4HANA environment and can help individuals to stand out in a competitive job market. Additionally, companies that employ SAP S/4HANA often require their employees to hold this certification as a way to ensure that they have the necessary skills and knowledge to effectively manage production planning and manufacturing processes.


SAP C_TS422_2021 exam is intended for professionals who have experience working with SAP S/4HANA Production Planning and Manufacturing. Candidates should have a deep understanding of the system's functionality, as well as experience configuring and maintaining the system in a production environment.

 

NEW QUESTION # 32
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

  • A. Plants parameters
  • B. MRP group
  • C. MRP controller
  • D. MRP profile

Answer: B


NEW QUESTION # 33
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP group
  • B. MRP type
  • C. MRP controller
  • D. MRP planning file

Answer: C


NEW QUESTION # 34
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?

  • A. SAP Concur
  • B. SAP SuccessFactors
  • C. SAP Ariba
  • D. SAP Hybris
  • E. SAP Fieldglass

Answer: A,C,E


NEW QUESTION # 35
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Lot size or material cost
  • B. Alphanumeric or quota arrangement
  • C. Planned order or material number
  • D. Valid period or sale order

Answer: B


NEW QUESTION # 36
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

  • A. In Customizing you can decide by material type whether to use the long material number.
  • B. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
  • C. The display template for material numbers applies to all clients.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: B,C


NEW QUESTION # 37
How can you carry out cost object controlling for production orders?

  • A. Order-related
  • B. Product-related
  • C. Milestone-related
  • D. Cost-related

Answer: A,B


NEW QUESTION # 38
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
  • B. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
  • C. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
  • D. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.

Answer: A


NEW QUESTION # 39
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Control cycle
  • B. Production supply area
  • C. Replenishment strategy
  • D. Rate routing

Answer: A


NEW QUESTION # 40
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

  • A. Setup matrix
  • B. Resource network
  • C. Operation network
  • D. Work center hierarchy

Answer: D


NEW QUESTION # 41
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. Co-products
  • B. Continuous flow materials
  • C. Waste products
  • D. By-products
  • E. Bulk materials

Answer: A,B,D


NEW QUESTION # 42
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning without final assembly (50)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Make-to-order production (20)

Answer: A


NEW QUESTION # 43
For what production type are production orders used?

  • A. Period and quantity-oriented production
  • B. Process manufacturing processes
  • C. Discrete manufacturing processes
  • D. Replenishment controlled by control cycles

Answer: C


NEW QUESTION # 44
You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in the past. How can you achive this?

  • A. Specify a positive planning horizon in the strategy profile.
  • B. Specify a negative offset time in the strategy profile.
  • C. Specify a positive offset time in the strategy profile.
  • D. Specify a negative lanning horizon in the strategy profile.

Answer: B


NEW QUESTION # 45
Which actions does the system preform by default when you save a confirmation for a finished product in repetitive manufacturing?

  • A. Archiving of documents for assembly scrap
  • B. Material staging for nex order in sequence
  • C. Reduction of associated capacity requirements
  • D. Posting of production costs to the production cost collector
  • E. Posting of goods receipt for the product

Answer: C,D,E


NEW QUESTION # 46
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Capacity Requirements Planning (CRP)
  • B. Integrated Business Planning (IBP)
  • C. Material Requirements Planning (MRP)
  • D. Supply Chain Management(SCM)

Answer: B,D


NEW QUESTION # 47
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you deliver a sales order
  • B. When you create a sales order
  • C. When the MRP result are saved
  • D. When you create a planned order

Answer: B


NEW QUESTION # 48
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Material requirements planning
  • B. Forecast planning
  • C. Consumption-based planning
  • D. Manual planning without check

Answer: C


NEW QUESTION # 49
......