NEW QUESTION # 166
You have determined that you need to execute a RASR factory upgrade of a VxRail v4.7.1xx node You download the RASR ISO from the Dell Support site.
What is the correct order of steps to finish the upgrade?
Answer:
Explanation:
NEW QUESTION # 167
What categories can be validated by the VxRail NVT?
- A. ToR Switches, Upstream Switches, and VxRail Nodes
- B. Network Services, ToR Switches, and VxRail Nodes
- C. Network Services, ToR Switches, and Upstream Switches
- D. Network Services, Upstream Switches, and VxRail Nodes
Answer: C
NEW QUESTION # 168
When adding a VxRail node the validation fails.
What could be the cause of this problem?
- A. DNS record was not created
- B. IPv6 multicasting is not enabled
- C. Only one network interface online
- D. Time on the node was not set correctly
Answer: C
NEW QUESTION # 169
What is a consideration when adding nodes to a VxRail G Series chassis?
- A. G Series can only scale up to 8 nodes
- B. All nodes in a G Series chassis must be identical
- C. In a full G Series chassis, all nodes must have 10GbE ports
- D. Hybrid and All-Flash nodes are permitted, if in different chassis
Answer: B
NEW QUESTION # 170
What is a consideration for using link aggregation on the Top of Rack (ToR) switch for a VxRail?
- A. Should not be used for VxRail node ports, but can be used for uplink and ISL
- B. Is not supported on the VxRail ToR switch
- C. Should always be configured for VxRail node ports to allow for failover
- D. Can be configured for any connectivity, but are not required
Answer: A
NEW QUESTION # 171
A Secure Remote Services deployment on a VxRail system with external vCenter fails with Invalid target datastore specified.
What action is required to resolve this problem?
- A. Ensure DNS is able to resolve the SRS/VE VM hostname
- B. Restart vCenter services and retry the deployment
- C. Manually deploy Secure Remote Services
- D. Retry the deployment through the retry button
Answer: C
NEW QUESTION # 172
A customer requires a Stretched VxRail Cluster with S570 nodes in its minimal configuration.
Which setup will fulfill the requirement?
- A. 6+6 nodes
- B. 2+2 nodes
- C. 4+4 nodes
- D. 3+3 nodes
Answer: D
NEW QUESTION # 173
Where can an administrator find steps to perform a manual verification of the customer network?
- A. Customer Simplified Form
- B. Pre-Engagement Questionnaire (PEQ)
- C. Dell EMC VxRail Network Planning Guide
- D. Dell Technologies SolVe Online
Answer: D
NEW QUESTION # 174
Which license must be provided by the customer for a VxRail deployment with embedded vCenter?
- A. VMware Log Insight
- B. VMware vSphere
- C. RecoverPoint
- D. VxRail Manager
Answer: B
NEW QUESTION # 175
What Is a supported method for racking nodes for a new VxRail deployment?
- A. Starting with node 1 at the top of the rack
- B. With PDUs connected to 120v single phase 5-amp electrical circuits
- C. In the rack hosting the network equipment used to manage the iDRAC
- D. With server exhaust facing the cold aisle
Answer: A
NEW QUESTION # 176
In which three VxRail Configuration Portal locations can an implementation engineer download the cluster configuration file? (Select 3)
- A. From the Validate Configuration File tab when editing a cluster
- B. From the My Clusters Tab in the VxRail Configuration Portal
- C. From the My Deployments tab in the VxRail Configuration Portal
- D. From the Resources tab in the Edit Cluster Configuration wizard
- E. From the customer Dell Digital Locker website
Answer: A,B,C
NEW QUESTION # 177
What is a valid 2-node VxRail cluster configuration deployment?
- A. External vCenter and internal witness
- B. Internal vCenter and external witness
- C. Internal vCenter and internal witness
- D. External vCenter and external witness
Answer: D
NEW QUESTION # 178
A 4 node VxRail solution will be deployed.
Based on the exhibit, what will be the host name assigned to the last node in the cluster?
- A. MyVxRaild.mycompany.com
- B. MyVxRail-4.mycompany.com
- C. MyVxRail-d.mycompany.com
- D. MyVxRail04.mycompany.com
Answer: C
NEW QUESTION # 179
Which vSAN rules are configured for the VXRAIL-SYSTEM-STORAGE-PROFILE?
- A. Failures to tolerate - 2 failures RAID-1 (Mirroring) Object space reservation - Thin provisioning
- B. Failures to tolerate - 1 failure RAID-1 (Mirroring) Object space reservation - Thick provisioning
- C. Failures to tolerate - 1 failure RAID-1 (Mirroring) Object space reservation - Thin provisioning
- D. Failures to tolerate - 1 failure RAID-5 (Erasure Coding) Object space reservation - Thick provisioning
Answer: A
NEW QUESTION # 180
You are validating that a network environment is ready for a 4 node VxRail Model V570F deployment.
What types of DNS records must be created for VxRail components before implementation can begin?
- A. Forward (A) records only
- B. Forward (A) records and Reverse (PTR) records
- C. Forward (A) and MX records
- D. NS records and Reverse (PTR) records
Answer: B
NEW QUESTION # 181
Which VxRail model requires iDRAC to be configured to LOM1?
- A. D
- B. S
- C. G
- D. V
Answer: C
NEW QUESTION # 182
What is the complete list of menu option choices available in the RASR factory reset procedure when booting from the RASR ISO?
- A. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- UPDATE FIRMWARE
- EXIT - B. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- QUIT - C. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- REBOOT
- UPDATE FIRMWARE
- EXIT - D. - RASR RESET
- CREATE RASRUSB
- FACTORY RESET
- REBOOT
- UPDATE FIRMWARE
- QUIT
Answer: B
NEW QUESTION # 183
An existing Dell EMC customer wants to deploy a new VxRail cluster on premise. Each node of the new cluster will be configured with a single disk group containing one 1.6 TB Flash drive for the capacity tier. The customer plans on using mirroring and needs to have at least 2 TB of usable capacity in the vSAN datastore.
What is the minimum number of VxRail nodes required?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 184
Which command is used to restart the Loudmouth process on an ESXi node?
- A. /etc/int.d/loudmouth restart
- B. systemcti restart vmware-loudmouth
- C. /usr/IibAmiware/loudmouth/bin/loudmouthd restart
- D. systemcti restart loudmouth
Answer: A
NEW QUESTION # 185
A company has gradually expanded their VxRail environment over a period of years. They now need to update all the VxRail systems to the same code level. However, the company is concerned about the cost.
How could the company benefit by using VxRail REST API in the upgrade?
- A. Report status of all running processes on a cluster or the status of a specific process
- B. Report system statistics, heartbeat, and available node information
- C. Create iDRAC logs, database logs, and downloads log extracts
- D. Enable automating of upgrade operations of one or more VxRail systems
Answer: D
NEW QUESTION # 186
An implementation engineer is tasked with setting up RecoverPoint for VMs on a 5-node V570F cluster.
How many VMs are licensed to be protected on the cluster?
- A. 0
- B. 1
- C. 2
- D. 3
Answer: D
NEW QUESTION # 187
Which software is included with VxRail and provides continuous replication of virtual machines deployed on a VxRail appliance?
- A. Dell EMC RecoverPoint for VMs
- B. VMware VM Snapshots
- C. Dell EMC RecoverPoint CRR
- D. VMware vSphereData Protection
Answer: A
NEW QUESTION # 188
......